Looking after the marina through to 2058
The LTAMP is our ongoing programme to maintain and renew every marina asset, from piers and walkways to the breakwater and electrical services. It began as a staged plan in 2019 and keeps the marina safe and in good condition through to the end of the licence in 2058. It is funded through capital contributions, licence fees, and asset and maintenance fees.
Stage one: 2019 to 2034
The LTAMP runs through to the end of the licence in 2058, in three stages: stage one from 2019 to 2034, stage two from 2034 to 2049, and stage three from 2049 to 2058. The projects below make up stage one. Each shows what’s complete, what’s in progress and what’s coming up.
Project managerProtege Limited
Project engineerOCEL
Walkway and wavescreen
Replacing the walkway and wavescreen along the marina in six phases. Each phase involves remediating the underpinning piles, demolishing the old walkway and wavescreen, installing UCs and cantilevered beams, and laying new decking, with new gates and railings and the walkway raised by 500 mm.
Main contractorUndersea Construction Limited
Nothing at this stage
- W55–64 (Pier D to E)
- W10–18 (Pier A to B)
- W19–28 (Pier A to B)
- W29–38 (Pier B to C)
- W39–48 (Pier B to C)
- W49–54 (Pier C to D)
Pier replacement
Replacing every pier in the marina. Piers A and B are complete.
ContractorsPoralu Marine, Engineering Solutions Ltd, Marathon Products and Seven Electrical
- Pier A: new service pillars and water stands, and emergency stands
- Pier B: new service pillars and water stands, and emergency stands
- Planning for Piers C, D and E
- Pier C replacement
- Pier D replacement
- Pier E replacement
Mains power upgrade
Replacing the mains power cable to upgrade capacity for the whole marina.
ContractorSeven Electrical
- Trenching and laying the new cable up to the termination pit
- New sub-cabinet for the south side of the marina
- New sub-cabinet for the north side of the marina
- New sub-cabinet and distribution box for the middle section of the marina
- New cables from the termination pit to the new distribution box, connecting to the other sub-cabinets and the whole marina
Breakwater
Maintaining the floating breakwater and the anchor chains that hold it in place.
ContractorUndersea Construction Limited
- Anchor chains inspected
- Six anchor chains replaced
- Ongoing maintenance works
- Underwater inspection of the anchor chains
Boat lift structure
Repairing the piles and supporting structure underneath the boat lift.
ContractorUndersea Construction Limited
- Piles repaired and Denso taped
Nothing at this stage
- Planning under way
Boat lift mechanical and electrical
Keeping the boat lift’s lifting cables, motors and electrical systems compliant and reliable.
- Lifting cables replaced to meet compliance requirements
- Platform motor axles and other components replaced, with a full service and inspection
Nothing at this stage
- Planning under way
Reports, photos and background