Wavescreen and walkway works: the next 12 months

A month-by-month look at the wavescreen and walkway works ahead, from Pier B through to Pier E, plus an update on Pier A.
Pier A walkway: final bay in place

The last bay of the new walkway between Pier A and A/B is in. The transition ramp, railings and gates come next.
Mains power upgrade: first stage complete
New cables now run from the substation to the marina’s termination pit, giving the marina a quick backup if the mains supply fails.
How the wavescreen and walkway are being rebuilt

Why the wavescreen and walkway are being replaced, who is doing the work, how each section is built and what slows it down.